Oasis Hallandale East Tower Tops Out

March 30, 2026

Oasis Hallandale has officially reached its full architectural height with the topping out of the East Tower. Standing at 25 stories, this milestone completes the vertical construction for the residential phase of the massive 10-acre mixed-use development in Hallandale Beach. Designed by the world-renowned firm Arquitectonica and developed by Giuseppe Iadisernia, the two-tower configuration creates a striking "gateway" entry sequence that frames views of the Atlantic and the city skyline.

The East Tower introduces 250 luxury condominiums ranging from 900 to 4,750 square feet, bringing the total residential count to 500 units between the two symmetrical structures. Central to the resident experience is a massive 70,000-square-foot amenity deck located on the sixth level. This elevated oasis includes resort-style pools, dedicated wellness and fitness spaces, coworking lounges, and family-oriented recreation facilities, offering a "city within a city" feel.

Unlike many standalone residential projects, Oasis Hallandale is already a living destination. The broader development includes 95,000 square feet of operational retail, dining, and office space, featuring established tenants like KC Market and Davinci Café. With the West Tower scheduled for delivery in early 2026 and the East Tower following in 2027, the project utilizes a staggered delivery model that allows the neighborhood to mature as the first residents move in.


Frequently Asked Questions (FAQs)

What is the significance of the East Tower topping out?

It marks the completion of the vertical structure for the final residential tower, reaching its planned 25-story height.

How many units are available at Oasis Hallandale?

The project features a combined total of 500 units (250 in each tower), with floor plans starting at 900 square feet.

What amenities are included in the 70,000-square-foot deck?

The shared deck features resort-style pools, fitness centers, coworking areas, and entertainment lounges.

Is the commercial space at Oasis Hallandale open?

Yes, approximately 95,000 square feet of retail and office space is already delivered and active with multiple tenants.

When can residents expect to move in?

The West Tower is projected for early 2026, while the East Tower is slated for 2027.

Send me more details about